Finley High School Covered Outdoor Learning Area

Facebook
Google+
Twitter
LinkedIn

Built in December 2016, Finley High School COLA was built as a large cover over the concrete area between school buildings. Features included Galvanized steel with no welding on-site, and bird-proofing to protect children from bird droppings.


Built with solid structure and roof, this outdoor cover will protect children from UV rays and stormy weather, allowing further access to outside educational areas in all weather conditions.

Contact Us Today For a No-Obligation Quote

Other Asset Building Systems Projects

Masada College Covered Walkway

Another School covered walkway built in January 2018. A fantastic effort by the team, this was installed in under 2 days once

Leave a Comment

Your email address will not be published. Required fields are marked *