
Finley High School Covered Outdoor Learning Area
Built in December 2016, Finley High School COLA was built as a large cover over the concrete area between school buildings. Features
02-6962-2458
02-6962-2458


Built in December 2016, Finley High School COLA was built as a large cover over the concrete area between school buildings. Features

Another School covered walkway built in January 2018. A fantastic effort by the team, this was installed in under 2 days once

A fantastic shelter has been built to provide the best care for the dogs & cats of the Griffith Region. Built in